What is this project?
Diversion of 0.23875 Ha. of Forest Land at Mewasi Forest Division for Laying Underground Optical Fiber Cable along the Road from Ranipur to Rapapur in Taluka-Taloda, Dist-Nandurbar in the State of Maharashtra is a lapsed telecom project in Kothar, Talode, Nandurbar, Maharashtra. The site covers 0.6 acres.
Who is building it?
The applicant is Shree Combines Private Limited.
Has it been approved?
No. The application was lapsed on 18 Dec 2024, so it is no longer under consideration.
Where is it?
In Kothar, Talode, Nandurbar, Maharashtra.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.6 acres and 1,980 m² of forest land.
When was it filed?
The application was filed on 9 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Dec 2024 |
| Application filed | 9 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Shree Combines Private Limited |
| Land area | 2,400 m² |
| Forest land | 1,980 m² |
| Project cost | ₹10 lakh |
| Village / locality | Kothar |
| Taluk / tehsil | Talode |
| District | Nandurbar |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-16164 |
In context
12 applications in Nandurbar since January 2022 are in the same category (Telecom): 1 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kothar, Talode, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — lapsed, 2.3 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 2.3 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 2.3 km away
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — forest land use approved, 2.7 km away
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed, 12.3 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — environmental approval granted, 17.6 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — cleared for impact study, 17.6 km away
- Mahua Distillery unit — cleared for impact study, 17.7 km away
More from Shree Combines Private Limited in Nandurbar
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — lapsed
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed
- Underground Ofc Cable Line From Khatwani, Molgi, Sari, Dahel, Oghani, Walamba… — more information requested
- Ofc Line From Shahada, Dara, Kakarda, Dhadgaon, Son to Khatwani at Akwani Till… — more information requested
6 Shree Combines projects in Nandurbar
All 49 Shree Combines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.