Quick answers
What is this project?
Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Lonkheda to GJ BOrder (Devipada)-Shahada is a lapsed telecom project in Mandvi Kh, Akrani, Nandurbar, Maharashtra. It seeks 4.5 acres of forest land.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
No. The application was lapsed on 21 Oct 2026, so it is no longer under consideration.
Where is it?
In Mandvi Kh, Akrani, Nandurbar, Maharashtra.
How big is it?
It has a stated cost of ₹37 lakh and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 30 Jan 2025.
Project details
| Official title | Proposal for re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Lonkheda to GJ BOrder (Devipada)-Shahada in Nandurbar District under Nandurbar Forest Division. In the state of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 21 Oct 2026 |
| Application filed | 30 Jan 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹37 lakh |
| Village / locality | Mandvi Kh |
| Taluk / tehsil | Akrani |
| District | Nandurbar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16005 |
In context
12 applications in Nandurbar since January 2022 are in the same category (Telecom): 1 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Mandvi Kh, Akrani, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.23875 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 12.3 km away
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — lapsed, 12.5 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 12.5 km away
- Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for Laying… — lapsed, 12.5 km away
- Re-Diversion of 0.43605 Ha. of Forest Land at Mewasi Forest Division for… — forest land use approved, 14.4 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — environmental approval granted, 18 km away
- Proposed 5 KLPD Mahua Flower-Based Distillery for Manufacturing of Potable… — cleared for impact study, 18 km away
- Mahua Distillery unit — cleared for impact study, 18 km away
More from Vodafone Idea Telecom Infrastructure Limited in Nandurbar
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — initial checks
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — initial checks
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — more information requested
4 Vodafone Idea Telecom projects in Nandurbar
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.