Quick answers
What is this project?
220 kV D/C Line from 765 kV AIS Balsane to 220 kV Shivajinagar is a proposed power project in Satare, Sindkhede, Dhule, Maharashtra. The site covers 883.5 acres.
Who is building it?
The applicant is Balsane Power Transmission Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Satare, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹125.2 crore; a site of 883.5 acres and 61.1 acres (24.7 ha) of forest land.
When was it filed?
The application was filed on 12 Oct 2026.
Project details
| Official title | Construction of 220 kV D/C Line from 765 kV AIS Balsane to 220 kV Shivajinagar |
|---|---|
| Status | More information requested |
| Status since | 23 Oct 2026 |
| Application filed | 12 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Balsane Power Transmission Limited |
| Land area | 883.5 acres (357.6 ha) |
| Forest land | 61.1 acres (24.7 ha) |
| Project cost | ₹125.2 crore |
| Village / locality | Satare |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14847 |
In context
14 applications in Dhule since January 2022 are in the same category (Power): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 883.5 acres, this one is larger than 86% of them.
Where it is
Satare, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for the proposed stone quarry of Sou. Jagruti Dinesh… — environmental approval granted, 11.9 km away
- Dhule PS – Dhule (BDTCL) 400 kV D/c Line (Quad ACSR/AAAC/AL59 Moose equivalent) — in-principle approval, conditions pending, 12.4 km away
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed, 12.5 km away
- Proposed Manufacturing Facilities of Nitrate Mixture - Slurry and Emulsion… — returned to applicant, 16.7 km away
- Proposed Manufacturing Facilities of Nitrate Mixture - Slurry and Emulsion… — lapsed, 16.7 km away
- Proposed Manufacturing Facilities of Nitrate Mixture - Slurry and Emulsion… — returned to applicant, 16.7 km away
- G. R. Tanti — lapsed, 17.1 km away
- Rehabilitation and Upgradation of Shewali(Sakri)-Nandurbar section of NH-753B… — initial checks, 18.6 km away
More from Balsane Power Transmission Limited in Dhule
- LILO on 765 kV D/C line from Dhule (BDTCL) to Khandwa PS at 765 kV AIS Balsane — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.