Quick answers
What is this project?
Design and construction of Tertiary Treated Water Conveyance Tunnel from Dharavi WwTF to Ghatkopar WwTF is a proposed project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 7.4 acres.
Who is building it?
The applicant is Brihanmumbai Municipal Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹1,989.4 crore; a site of 7.4 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 4 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Design and construction of Tertiary Treated Water Conveyance Tunnel from Dharavi WwTF to…
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 7 Feb 2026 |
| Application filed | 4 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Brihanmumbai Municipal Corporation |
| Land area | 7.4 acres (3 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹1,989.4 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15339 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Jul 2025 | Coastal clearance granted | 0.1 acres | ₹1,989.4 crore |
| New project filed 4 May 2025 (this page) | In-principle approval, conditions pending | 7.4 acres | ₹1,989.4 crore |
In context
33 applications in Mumbai Suburban since January 2022 are in the same category (Other): 13 approved, 12 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.4 acres, this one is larger than 59% of them.
300 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.3 km away).
Other projects nearby
- Application for Amendment and Expansion in EC for proposed Residential cum… — environmental approval granted, 200 m away
- Application for Amendment and Expansion in EC for proposed Residential cum… — environmental approval granted, 200 m away
- Proposed redevelopment of the existing Building No 3 , known as Tilak Nagar… — environmental approval granted, 400 m away
- Proposed Residential Building known as " Premier By Kukreja" at Plot Bearing… — environmental approval granted, 450 m away
- Proposed Redevelopment of SWM Staff Quarters on plot bearing C.T.S. No.… — environmental approval granted, 550 m away
- Proposed Redevelopment under clause 33(7) (B) of MCGM DCPR 2034 of existing… — withdrawn, 600 m away
- Proposed Redevelopment under clause 33(7) (B) of MCGM DCPR 2034 of existing… — environmental approval granted, 600 m away
- Proposed Composite Building under S.R.Scheme on plot bearing C.T.S. No.… — environmental approval granted, 700 m away
More from Brihanmumbai Municipal Corporation in Mumbai Suburban
- Flyover Arm-1 & Arm-2 at T-Junction on Sion Panvel Highway near Maharashtra… — under coastal review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — under wildlife review
- Diversion of 1.6202 Ha. Forest (Mangrove) Land for Proposed Shifting of… — more information requested
- Diversion of forest land for construction of Twin Tunnel from Dharavi WwTF… — more information requested
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — under wildlife review
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — withdrawn
49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.