Coastal clearance grantedOther · Mumbai Suburban, Maharashtra

Design and construction of Tertiary Treated Water Conveyance Tunnel from Dharavi WwTF to Ghatkopar WwTF

Design and construction of Tertiary Treated Water Conveyance Tunnel from Dharavi WwTF to Ghatkopar WwTF is an approved project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.1 acres. Its stated project cost is ₹1,989.4 crore. As of 27 Nov 2026, its status is “Coastal clearance granted” (since 25 Nov 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Design and construction of Tertiary Treated Water Conveyance Tunnel from Dharavi WwTF to Ghatkopar WwTF is an approved project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.1 acres.

Who is building it?

The applicant is Brihanmumbai Municipal Corporation.

Has it been approved?

Yes. Its status is “Coastal clearance granted” (since 25 Nov 2025), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹1,989.4 crore and a site of 0.1 acres.

When was it filed?

The application was filed on 9 Jul 2025.

Project details

StatusCoastal clearance granted
Status since25 Nov 2025
Application filed9 Jul 2025
Approval soughtCoastal review
Application typeNew project
SectorOther
ApplicantBrihanmumbai Municipal Corporation
Land area400 m²
Project cost₹1,989.4 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-17608

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Jul 2025 (this page)Coastal clearance granted0.1 acres₹1,989.4 crore
New project filed 4 May 2025In-principle approval, conditions pending7.4 acres₹1,989.4 crore

In context

33 applications in Mumbai Suburban since January 2022 are in the same category (Other): 13 approved, 12 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 96% of them.

324 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.9 km away).

Other projects nearby

More from Brihanmumbai Municipal Corporation in Mumbai Suburban

49 Brihanmumbai Municipal Corporation projects in Mumbai
All 59 Brihanmumbai Municipal Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.