LapsedRoads & highways · Ahmadnagar, Maharashtra

Up-gradation to two lane with paved shoulder/Four lane configuration (Package No. Nashik-IV) Nhavra-Inamgaon-Kashti-Srigonda Adhalgaon-Jalgaoon-Jamkhed section of SH-55(New NH-548D), FROM KM 132.600 TO KM 195.375, DESIGN LENGTH = 62.775 KM, in the state of Maharashtra.

Up-gradation to two lane with paved shoulder/Four lane configuration (Package No. Nashik-IV) Nhavra-Inamgaon-Kashti-Srigonda Adhalgaon-Jalgaoon-Jamkhed section of SH-55(New NH-548D), FROM KM 132.600 TO KM 195.375, DESIGN LENGTH = 62.775 KM, in the state of Maharashtra is a lapsed road project in Arangaon, Jamkhed, Ahmadnagar, Maharashtra. The site covers 1 acre. Its stated project cost is ₹399.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 23 Jan 2025).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Up-gradation to two lane with paved shoulder/Four lane configuration (Package No. Nashik-IV) Nhavra-Inamgaon-Kashti-Srigonda Adhalgaon-Jalgaoon-Jamkhed section of SH-55(New NH-548D), FROM KM 132.600 TO KM 195.375, DESIGN LENGTH = 62.775 KM, in the state of Maharashtra is a lapsed road project in Arangaon, Jamkhed, Ahmadnagar, Maharashtra. The site covers 1 acre.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

No. The application was lapsed on 23 Jan 2025, so it is no longer under consideration.

Where is it?

In Arangaon, Jamkhed, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹399.3 crore; a site of 1 acre and 1 acres (0.4 ha) of forest land.

When was it filed?

The application was filed on 12 May 2023.

Project details

StatusLapsed
Status since23 Jan 2025
Application filed12 May 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area1 acres (0.4 ha)
Forest land1 acres (0.4 ha)
Project cost₹399.3 crore
Village / localityArangaon
Taluk / tehsilJamkhed
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15458

In context

15 applications in Ahmadnagar since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 91% of them.

Where it is

Arangaon, Jamkhed, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Ahmadnagar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.