Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra.

Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra is a proposed project in Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. The site covers 42 acres. Its stated project cost is ₹402.8 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 28 Oct 2026).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra is a proposed project in Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. The site covers 42 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Dokewadi, Shrigonda, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹402.8 crore and a site of 42 acres.

When was it filed?

The application was filed on 25 Sept 2026.

Project details

StatusUnder wildlife review
Status since28 Oct 2026
Application filed25 Sept 2026
Approval soughtWildlife review
Application typeNew project
SectorOther
ApplicantMinistry of Road Transport & Highways
Land area42 acres (17 ha)
Project cost₹402.8 crore
Village / localityDokewadi
Taluk / tehsilShrigonda
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16918

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Sept 2026 (this page)Under wildlife review42 acres₹402.8 crore
New project filed 22 Jan 2025Lapsed₹399.3 crore
New project filed 25 Oct 2023Under wildlife review42 acres₹399.3 crore

In context

18 applications in Ahmadnagar since January 2022 are in the same category (Other): 0 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. At 42 acres, this one is smaller than 56% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Ahmadnagar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.