What is Developing? Open the mapMap

LapsedRoads & highways · Ahmadnagar, Maharashtra

Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra.

Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra is a lapsed road project in Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. It seeks 12 acres of forest land. Its stated project cost is ₹399.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2025).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations of Nh-548d Adhalgaon to Jamkhed Section Design Chainage Km 132.600 to Km 195.375 on Epc Mode in the State of Maharashtra is a lapsed road project in Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. It seeks 12 acres of forest land.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

No. The application was lapsed on 29 Oct 2025, so it is no longer under consideration.

Where is it?

In Dokewadi, Shrigonda, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹399.3 crore and 12 acres (4.9 ha) of forest land.

When was it filed?

The application was filed on 22 Jan 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Up-Gradation/Reconstruction to Two Lanes With Paved Shoulder / Four Lane Configurations…

Project details

StatusLapsed
Status since29 Oct 2025
Application filed22 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Forest land12 acres (4.9 ha)
Project cost₹399.3 crore
Village / localityDokewadi
Taluk / tehsilShrigonda
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16257

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 25 Sept 2026Under wildlife review42 acres₹402.8 crore
New project filed 22 Jan 2025 (this page)Lapsed₹399.3 crore
New project filed 25 Oct 2023Under wildlife review42 acres₹399.3 crore

In context

15 applications in Ahmadnagar since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dokewadi, Shrigonda, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Road Transport & Highways in Ahmadnagar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.