What is Developing? Open the mapMap

LapsedRoads & highways · Raigarh, Maharashtra

Diversion of Mangrove Forest Land for Integrated Development for Construction of Bridges, Roads, Channels

Diversion of Mangrove Forest Land for Integrated Development for Construction of Bridges, Roads, Channels is a lapsed road project in Dongari, Uran, Raigarh, Maharashtra. The site covers 17.7 acres. Its stated project cost is ₹43.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 13 Apr 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Mangrove Forest Land for Integrated Development for Construction of Bridges, Roads, Channels is a lapsed road project in Dongari, Uran, Raigarh, Maharashtra. The site covers 17.7 acres.

Who is building it?

The applicant is City and Industrial Development Corporation of Maharashtra Limited.

Has it been approved?

No. The application was lapsed on 13 Apr 2026, so it is no longer under consideration.

Where is it?

In Dongari, Uran, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹43.5 crore; a site of 17.7 acres and 17.7 acres (7.2 ha) of forest land.

When was it filed?

The application was filed on 31 May 2023.

Project details

Official titleDiversion of Mangrove Forest Land for Integrated Development for Construction of Bridges, Roads, Channels along with sewer rising main, water supply rising main, electrical works, any other utilities and allied works connecting Sector – 15, 15A, 27, 41, 48, 50, 51, 52, 54, 55, 56 & 57, At Village Chanje, Bokadvira, Bendkhal, Phunde, Dongari, Taluka Uran, District Raigad, Maharashtra State
StatusLapsed
Status since13 Apr 2026
Application filed31 May 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantCity and Industrial Development Corporation of Maharashtra Limited
Land area17.7 acres (7.2 ha)
Forest land17.7 acres (7.2 ha)
Project cost₹43.5 crore
Village / localityDongari
Taluk / tehsilUran
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15788

In context

70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 17.7 acres, this one is larger than 52% of them.

63 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dongari, Uran, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh

27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.