Area development of Dhakale Island including Connectivity works and Construction of the Proposed Airport Surveillance Radar (ASR-1) – A critical Air Navigational & Surveillance Facility for operation of Navi Mumbai International Airport at Dhakale Island, Village Shahbaj, Navi Mumbai.

Area development of Dhakale Island including Connectivity works and Construction of the Proposed Airport Surveillance Radar (ASR-1) – A critical Air Navigational & Surveillance Facility for operation of Navi Mumbai International Airport at Dhakale Island, Village Shahbaj, Navi Mumbai is a lapsed building project in Targhar, Panvel, Raigarh, Maharashtra. The site covers 16.8 acres. Its stated project cost is ₹169 crore. As of 27 Nov 2026, its status is “Lapsed” (since 20 Nov 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Area development of Dhakale Island including Connectivity works and Construction of the Proposed Airport Surveillance Radar (ASR-1) – A critical Air Navigational & Surveillance Facility for operation of Navi Mumbai International Airport at Dhakale Island, Village Shahbaj, Navi Mumbai is a lapsed building project in Targhar, Panvel, Raigarh, Maharashtra. The site covers 16.8 acres.

Who is building it?

The applicant is City and Industrial Development Corporation of Maharashtra Limited.

Has it been approved?

No. The application was lapsed on 20 Nov 2026, so it is no longer under consideration.

Where is it?

In Targhar, Panvel, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹169 crore; a site of 16.8 acres and 1.3 acres (0.5 ha) of forest land.

When was it filed?

The application was filed on 27 Sept 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Area development of Dhakale Island including Connectivity works and Construction of the…

Project details

StatusLapsed
Status since20 Nov 2026
Application filed27 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantCity and Industrial Development Corporation of Maharashtra Limited
Land area16.8 acres (6.8 ha)
Forest land1.3 acres (0.5 ha)
Project cost₹169 crore
Village / localityTarghar
Taluk / tehsilPanvel
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15818

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Jan 2025In-principle approval, conditions pending16.8 acres₹169 crore
New project filed 24 Jan 2024Coastal clearance granted16.8 acres₹169 crore
New project filed 27 Sept 2023 (this page)Lapsed16.8 acres₹169 crore

In context

674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.8 acres, this one is larger than 79% of them.

64 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Targhar, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh

27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.