Quick answers
What is this project?
Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along the road in ROW of existing road from Nandurbar to Navapur route is a proposed telecom project in Pawle, Nandurbar, Maharashtra. It seeks 0.5 acres of forest land.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pawle, Nandurbar, Maharashtra.
How big is it?
It has a stated cost of ₹25 lakh and 1,880 m² of forest land.
When was it filed?
The application was filed on 12 Jul 2026.
Project details
| Official title | Proposal for Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along the road in ROW of existing road from Nandurbar to Navapur route in Nandurbar and Navapur Tehsil of Dist. Nandurbar in state of Maharashtra. (Vodafone Idea) |
|---|---|
| Status | Initial checks |
| Status since | 13 Jul 2026 |
| Application filed | 12 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Forest land | 1,880 m² |
| Project cost | ₹25 lakh |
| Village / locality | Pawle |
| Taluk / tehsil | Nandurbar |
| District | Nandurbar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16062 |
In context
12 applications in Nandurbar since January 2022 are in the same category (Telecom): 1 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Pawle, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-appraisal of Environmental Clearance granted by DEIAA for Stone Quarry… — lapsed, 5.3 km away
- 100 Seated Government Medical College, 500 Bedded Hospital and Allied… — environmental approval granted, 22.1 km away
- Proposed Manufacturing of Synthetic Organic Chemicals by M/s. Kesarinandan… — environmental approval granted, 25.7 km away
- Proposed Manufacturing of Synthetic Organic Chemicals by M/s. Kesarinandan… — cleared for impact study, 25.7 km away
- Project by Vijay Suraksha Realty LLP — lapsed, 26.1 km away
- 33 KV D/C Overhead Transmission Line from Suzlon Existing 33kV Double Pole — in-principle approval, conditions pending, 27.4 km away
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — more information requested, 31.3 km away
- Shri Ganeshbhai Dilipbhai Patil- Baslat Stone Quarry (Area 2.00 Ha) at Gut No.… — environmental approval granted, 34.1 km away
More from Vodafone Idea Telecom Infrastructure Limited in Nandurbar
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — initial checks
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — more information requested
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed
4 Vodafone Idea Telecom projects in Nandurbar
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.