Project details
| Status | Not approved |
|---|---|
| Status since | 20 Dec 2024 |
| Application filed | 19 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mahatransco |
| Land area | 269.1 acres (108.9 ha) |
| Forest land | 126.5 acres (51.2 ha) |
| Project cost | ₹63.7 crore |
| Village / locality | Bahare |
| Taluk / tehsil | Dahanu |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16138 |
In context
23 applications in Palghar since January 2022 are in the same category (Power): 5 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 269.1 acres, this one is smaller than 68% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahare, Dahanu, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DIVERSION OF 44.2368 Ha. FOREST LAND FOR CONSTRUCTION OF 132 KV DC LINE FROM… — lapsed, 1.6 km away
- 8 lane Access controlled Highways For Connectivity to Proposed Vadhavan Port… — in-principle approval, conditions pending, 5.1 km away
- Mumbai Ahmedabad High Speed Rail Project — forest land use approved, 5.3 km away
- 8 Lane Access Controlled Highways For Connectivity to Proposed Vadhavan Port… — lapsed, 5.5 km away
- Vadhavan Port Water Supply Scheme, Taluka – Dahanu, District – Palghar by… — more information requested, 6 km away
- Widening and Strengthening of the existing road (ODR 35) from the village… — under forest review, 6.3 km away
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — environmental approval granted, 6.4 km away
- Gargaon stone - 17.08 Ha in connection with Vadhvan Port Project by Jawaharlal… — under environmental review, 6.4 km away
More from Mahatransco in Palghar
- Diversion of 1.7080 Ha. Forest Land for Proposed Construction 220 KV PG-Manor… — more information requested
- "Lilo on Existing 220kv Boisar (PGCIL) – Vasai Line at 220kv Chikhaldongri… — under forest review
- Diversion of 2.2950 Ha. Forest Land for Proposed 132 KV DCMC line from LILO on… — in-principle approval, conditions pending
- Diversion of 3.9069 Ha Forest Land For Proposed LILO on 132 KV Dahanu –… — in-principle approval, conditions pending
- LILO on existing 220 kV Boisar (PGCIL)-Vasai Line at 220 kV Chikhaldongari… — coastal clearance granted
- 132KV DAHANU-AMBESARI TRANSMISSION LINE FOR ESTABLISHMENT OF PROPOSED NHSRCL'S… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.