Project details
| Status | More information requested |
|---|---|
| Status since | 21 Oct 2026 |
| Application filed | 30 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mahatransco |
| Land area | 185.1 acres (74.9 ha) |
| Forest land | 4.2 acres (1.7 ha) |
| Project cost | ₹59.3 crore |
| Village / locality | Chari Kh. |
| Taluk / tehsil | Palghar |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14652 |
In context
23 applications in Palghar since January 2022 are in the same category (Power): 5 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 185.1 acres, this one is smaller than 73% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chari Kh., Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission to Use Restored Private Forest Land Construction of Access/Approach… — in-principle approval, conditions pending, 2.7 km away
- Boisar-II (Sec-II)-Velgaon (MH) 400kV D/C (Quad) Transmission Line — more information requested, 4.2 km away
- Proposed Expansion in manufacturing of SS fastener & Threaded bar with… — under environmental review, 4.7 km away
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — under environmental review, 5.7 km away
- Proposed Regularization & Expansion of Manufacturing of Hot Rolled Stainless… — cleared for impact study, 5.7 km away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — environmental approval granted, 5.9 km away
- Khanivade stone Quarry - 15.39 Ha in connection with Vadhvan Port Project by… — under environmental review, 5.9 km away
- Proposed Quarry for Construction of Vadhavan Port, Road & Railway Project by… — in-principle approval, conditions pending, 6.2 km away
More from Mahatransco in Palghar
- "Lilo on Existing 220kv Boisar (PGCIL) – Vasai Line at 220kv Chikhaldongri… — under forest review
- Diversion of 2.2950 Ha. Forest Land for Proposed 132 KV DCMC line from LILO on… — in-principle approval, conditions pending
- Diversion of 3.9069 Ha Forest Land For Proposed LILO on 132 KV Dahanu –… — in-principle approval, conditions pending
- LILO on existing 220 kV Boisar (PGCIL)-Vasai Line at 220 kV Chikhaldongari… — coastal clearance granted
- 132KV DAHANU-AMBESARI TRANSMISSION LINE FOR ESTABLISHMENT OF PROPOSED NHSRCL'S… — coastal clearance granted
- 132 KV DCDC line from 132 KV Dahanu substation to 132 KV Suryanagar substation… — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.