Quick answers
What is this project?
Expansion in Limestone Production Capacity from 1.5 million TPA to 3.5 million TPA, Top Soil 0.13 million TPA, Waste/OB/IB 2.26 million TPA, Sub Grade 0.50 million TPA (Total Excavation 6.39 million TPA) and Proposed crusher of 1600 TPH in Maratha Limestone Mine, ML - I (ML Area – 579.90 ha) in Villages- Thutra and Lakhmapur (Tehsil: Korpana) and Hirapur, Isapur and Sonapur (Tehsil: Rajura), District- Chandrapur, State: Maharashtra of Ambuja Cements Ltd is a proposed building project in Sonapur, Rajura, Chandrapur, Maharashtra. The site covers 1,433 acres.
Who is building it?
The applicant is Ambuja Cements Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sonapur, Rajura, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹137 crore and a site of 1,433 acres.
When was it filed?
The application was filed on 1 Jul 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 1 Jul 2024 |
| Application filed | 1 Jul 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ambuja Cements Limited |
| Land area | 1,433 acres (579.9 ha) |
| Project cost | ₹137 crore |
| Village / locality | Sonapur |
| Taluk / tehsil | Rajura |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16492 |
What the filings say
What is planned
Ambuja Cements Limited proposes to expand the limestone production capacity of its Maratha Limestone Mine (ML-I) from 1.5 million tonnes per annum (TPA) to 3.5 million TPA. The project report states this expansion is required to meet the raw material needs of the company's integrated cement plant, which is also undergoing expansion.
The total excavation at the mine will increase to 6.39 million TPA, which includes:
- Limestone: 3.5 million TPA
- Top Soil: 0.13 million TPA
- Waste/Overburden/Inter-burden: 2.26 million TPA
- Sub-grade mineral: 0.50 million TPA
The applicant also proposes to install a new crusher with a capacity of 1,600 tonnes per hour (TPH). The mining will continue using fully mechanized opencast methods involving drilling, blasting, and heavy earth-moving machinery. The ultimate pit depth is planned to reach 178 meters above mean sea level (AMSL), approximately 80 meters below ground level.
Layout and design
The mining lease area covers 579.90 hectares. According to the conceptual plan, the total mined-out area at the end of the lease period (December 2034) will be 141.9 hectares. Of this, 16.72 hectares will be converted into a water reservoir, while 125.18 hectares will remain active for future working.
A waste dump covering 56.70 hectares is planned for a non-mineralized area, and a sub-grade dump will occupy 15.30 hectares. Both are intended to be stabilized through plantation and re-grassing. A safety zone of 50 meters will be maintained along the public PWD road and a seasonal nalla that pass through the lease area.
Land and surroundings
The lease area consists of 575.25 hectares of private agricultural land and 4.65 hectares of government land. The applicant states that 494.08 hectares of private land have already been acquired, with the remainder to be acquired as needed.
The site is located in a seismic Zone II area. While no national parks or wildlife sanctuaries exist within a 10 km radius, the Manikgarh Reserved Forest is situated approximately 1.5 km to the south. A seasonal stream, the Tutra Nala, passes through the center of the lease area.
Water, power and access
The total water requirement for the expanded operations is estimated at 140 kilolitres per day (KLD). This will be sourced from the Pagdigudam reservoir and existing mine sumps. Approximately 8 KLD of wastewater generated from workshop operations will be treated using an oil-water separator and reused for dust suppression.
Access to the site is via State Highway 6 (20 km north) and National Highway 264 (17 km east). The nearest railway station is Balharshah Junction, located about 20 km away.
Environmental safeguards
To mitigate air pollution, the applicant proposes using wet drilling and dust collection systems. Water tankers equipped with mist guns and permanent sprinklers will be used on haul roads. The crusher hopper will feature an atomized water mist sprayer.
For water protection, 5,294 meters of garland drains and a settling pond of 3,369 square meters have been constructed to manage surface runoff from waste dumps. Noise control measures include using rock breakers instead of secondary blasting and providing acoustic cabins for machinery operators.
What was said at the public hearing
A public hearing was held on 3 May 2023 at the project site. Local residents and representatives raised several concerns:
- Employment: Participants alleged that many project-affected persons (PAPs) from previous land acquisitions had not yet received jobs and questioned the use of Voluntary Retirement Schemes (VRS) for existing staff.
- Pollution: Residents claimed that air pollution levels in Gadchandur had increased significantly and that dust was accumulating in nearby houses due to blasting.
- Safety: Concerns were raised about a large, water-filled pit where several people had reportedly lost their lives; the applicant was asked to fill this pit with overburden.
- Infrastructure: Demands were made for a railway overbridge at the Hardona crossing and the construction of a bus stand in Gadchandur.
The applicant responded that PAPs are given priority for employment and that 80% of the current workforce is local. They committed to monitoring the inactive pit and maintaining safety fencing as per government guidelines.
Expansion in Limestone Production Capacity from 1.5 Million TPA to 3.5 Million TPA, Top Soil 0.13 Million TPA, Waste/OB/IB 2.26 Million TPA, Sub Grade 0.50 Million TPA (Total Excavation 6.39 Million TPA) and Crusher of 1600 TPH in Maratha Limestone Mine, ML - I (ML Area – 579.90 Ha) in Villages- Thutra and Lakhmapur (Tehsil: Korpana) and Hirapur, Isapur and Sonapur (Tehsil: Rajura), District- Chandrapur, State: Maharashtra of Ambuja Cements Ltd site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
26 applications in Chandrapur since January 2022 are in the same category (Buildings & townships): 1 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 1,433 acres, this one is larger than 92% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sonapur, Rajura, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Limestone Production Capacity from 1.5 million TPA to 3.5 million… — environmental approval granted, 650 m away
- Expansion in Limestone Production Capacity from 2.0 Million TPA to 3.5 Million… — lapsed, 2.1 km away
- Expansion of Integrated Cement Project (Clinker - 2.85 to 6.15 Million TPA,… — environmental approval granted, 2.8 km away
- Expansion of Cement Plant (2.85 MTPA to 4.75 MTPA), Clinker Production (2.40… — environmental approval granted, 3 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — lapsed, 3.8 km away
- Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G… — lapsed, 5.8 km away
- 4-laning of Govindpur to Rajura section of NH-353B — decision issued, 7.1 km away
- Preliminary Exploration for locating Limestone deposit in Naokari Budruk area… — initial checks, 7.4 km away
More from Ambuja Cements Limited in Chandrapur
- Expansion in Limestone Production Capacity from 2.0 Million TPA to 3.5 Million… — lapsed
- Expansion in Limestone Production Capacity from 1.5 million TPA to 3.5 million… — environmental approval granted
3 Ambuja Cements projects in Chandrapur
All 87 Ambuja Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.