Quick answers
What is this project?
Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G Saturation project under Central Chanda Forest Division is a lapsed telecom project in Bhavi, Rajura, Chandrapur, Maharashtra. The site covers 1.6 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Bhavi, Rajura, Chandrapur, Maharashtra.
How big is it?
It has a site of 1.6 acres and 1.6 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 19 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 19 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Village / locality | Bhavi |
| Taluk / tehsil | Rajura |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-15741 |
In context
15 applications in Chandrapur since January 2022 are in the same category (Telecom): 0 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhavi, Rajura, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Cement Plant (2.85 MTPA to 4.75 MTPA), Clinker Production (2.40… — environmental approval granted, 2.8 km away
- Expansion of Integrated Cement Project (Clinker - 2.85 to 6.15 Million TPA,… — environmental approval granted, 3.2 km away
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — lapsed, 5.7 km away
- Expansion in Limestone Production Capacity from 1.5 million TPA to 3.5 million… — environmental approval granted, 5.8 km away
- Expansion in Limestone Production Capacity from 1.5 million TPA to 3.5 million… — more information requested, 5.8 km away
- Expansion in Limestone Production Capacity from 2.0 Million TPA to 3.5 Million… — lapsed, 6.6 km away
- Modification in existing 2.0 MTPA Deshaled Coal Crushing Unit to 2.0 MTPA Wet… — cleared for impact study, 6.8 km away
- Modification in existing Deshaled Coal Crushing Unit to 2.0 MTPA Wet Coal… — environmental approval granted, 6.8 km away
More from Mahesh Nair in Chandrapur
- Diversion of 0.2Ha. Forest Land for installation of 4G Mobile Towers at 10… — more information requested
- Diversion of Land of area 0.018 ha — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- 4G Saturation BSNL- Village Alphar alias Satara Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village BABAPUR Tal Jiwati Land for the Tower — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.