Project details
| Status | Under wildlife review |
|---|---|
| Status since | 15 Sept 2024 |
| Application filed | 15 Sept 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 1,87,844.8 acres (76,018.2 ha) |
| Project cost | ₹8,067.5 crore |
| Village / locality | Agar Kanadgaon |
| Taluk / tehsil | Gangapur |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16639 |
Where it is
Agar Kanadgaon, Gangapur, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design, Procurement, Testing and Commissiong of Water Treatment Plant (70mld)… — more information requested, 13.2 km away
- Bramhagavan Lift Irrigation Scheme (Part I & Part II) — under wildlife review, 13.8 km away
- Project by M/s. Bioaltus Laboratories Private Limited — initial checks, 15.2 km away
- Industrial project by M/s Bioaltus Laboratories Private Limited, — environmental approval granted, 15.2 km away
- Product Mix Certification under No Increase in Pollution Load for the project… — initial checks, 15.2 km away
- Product mix Certification under No increasing pollution load for the project… — initial checks, 15.2 km away
- Pump House and Rising Main of Bramhagavan Lift Irrigation Scheme (Part-II) — more information requested, 15.2 km away
- Proposed Expansion of Existing Grain Based Distillery from 40 KLPD (40 KL x… — returned to applicant, 15.3 km away
4 NTPC projects in Aurangabad
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.