Quick answers
What is Culverts at Kanjurmarg Dumping Ground, Mumbai, Maharashtra?
Culverts at Kanjurmarg Dumping Ground, Mumbai, Maharashtra is a proposed project in Kanjur, Mumbai Suburban, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is A.P.I. Civilcon Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kanjur, Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹4.3 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 26 Sept 2022.
Project details
| Official title | Construction of Culverts at Kanjurmarg Dumping Ground, Mumbai, Maharashtra |
|---|---|
| Status | More information requested |
| Status since | 26 Sept 2022 |
| Application filed | 26 Sept 2022 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | A.P.I. Civilcon Private Limited |
| Land area | 300 m² |
| Project cost | ₹4.3 crore |
| Village / locality | Kanjur |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17908 |
In context
33 applications in Mumbai Suburban since January 2022 are in the same category (Other): 13 approved, 12 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.
223 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanjur, Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (2.8 km away).
Other projects nearby
- Obtaining CRZ Clearance for the PROPOSED REDEVELOPMENT OF BUILDING NO. 99, AT… — recommended by coastal authority, 500 m away
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — under wildlife review, 550 m away
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — more information requested, 550 m away
- Proposed Redevelopment of Existing Transit Camp with LIG and MIG Type… — environmental approval granted, 600 m away
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — coastal clearance granted, 700 m away
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — withdrawn, 700 m away
- Design and Construction of Tertiary Treated Water Conveyance Tunnel From… — withdrawn, 700 m away
- Proposed Redevelopment project "SKYE-175" located at Building No. 175, Survey… — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.