Quick answers
What is this project?
Jetty, Parking Shed and Other Allied Works at Toradi, Taluka- Mhasla, District- Raigad, Maharashtra is an approved port and coastal project in Bandwadi, Mhasla, Raigarh, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Maharashtra Maritime Board.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 29 Jan 2026), as of 27 Nov 2026.
Where is it?
In Bandwadi, Mhasla, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹30.5 crore and a site of 0 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Official title | Proposed Construction of Jetty, Parking Shed and Other Allied Works at Toradi, Taluka- Mhasla, District- Raigad, Maharashtra. |
|---|---|
| Status | Coastal clearance granted |
| Status since | 29 Jan 2026 |
| Application filed | 30 Apr 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Maharashtra Maritime Board |
| Land area | 100 m² |
| Project cost | ₹30.5 crore |
| Village / locality | Bandwadi |
| Taluk / tehsil | Mhasla |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17216 |
In context
54 applications in Raigarh since January 2022 are in the same category (Ports & coast): 25 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
Where it is
Bandwadi, Mhasla, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for laying of underground OFC duct & cable within RoW… — lapsed, 5.6 km away
- Wadshet Vave M.I. Scheme — in-principle approval, conditions pending, 5.7 km away
- Wadshet Vave M.I. Scheme — lapsed, 5.7 km away
- Diversion of Forest Land Under Van (Sanrakshan Evam Samvardhan) Adhiniyam,… — in-principle approval, conditions pending, 7.9 km away
- Environmental Clearance for Karivane Bauxite Mine Project (Mine Lease Area =… — cleared for impact study, 8 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — coastal clearance granted, 9.6 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — returned to applicant, 9.6 km away
- Parking Space & Providing Other Facilities at Bagmandla, Tal. Shrivardhan,… — lapsed, 12.2 km away
More from Maharashtra Maritime Board in Raigarh
- Application for Terms of Reference (ToR) for Development of Marine Shipyard… — under environmental review
- Providing and Installation of Floating Jetty for Police Launch Section at… — recommended by coastal authority
- Proposed Maintenance Dredging to Clear/Generate Navigational Channel — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed
15 Maharashtra Maritime Board projects in Raigarh
All 101 Maharashtra Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.