Quick answers
What is this project?
Extension of Jetty and Providing Parking Facilities at Gothe, Taluka- Mahad, District- Raigad Maharashtra is a withdrawn port and coastal project in Gothe Bk., Mahad, Raigarh, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Maharashtra Maritime Board.
Has it been approved?
No. The application was withdrawn on 15 Jul 2025, so it is no longer under consideration.
Where is it?
In Gothe Bk., Mahad, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 15 Jul 2025.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 15 Jul 2025 |
| Application filed | 15 Jul 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Maharashtra Maritime Board |
| Land area | 600 m² |
| Project cost | ₹2.2 crore |
| Village / locality | Gothe Bk. |
| Taluk / tehsil | Mahad |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17663 |
In context
54 applications in Raigarh since January 2022 are in the same category (Ports & coast): 25 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.1 acres, this one is smaller than 96% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gothe Bk., Mahad, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of extending the disposal pipe line in Savitri River/Bankot… — application filed, 4.3 km away
- Environmental Clearance for Proposed Residential Colony by M/s. Grasim… — environmental approval granted, 11.2 km away
- Proposed Expansion of Synthetic Organic Chemicals manufacturing facility By… — environmental approval granted, 12.3 km away
- Change in product mix without expansion of product tonnage by M/s. Savita Oil… — initial checks, 12.8 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — coastal clearance granted, 12.9 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — returned to applicant, 12.9 km away
- Change in Existing Product Mix and Addition of a New Products on No Increase… — initial checks, 13 km away
- Consent to Operate Based on No Increase in Pollution Load for synthetic… — initial checks, 13 km away
More from Maharashtra Maritime Board in Raigarh
- Application for Terms of Reference (ToR) for Development of Marine Shipyard… — under environmental review
- Providing and Installation of Floating Jetty for Police Launch Section at… — recommended by coastal authority
- Proposed Maintenance Dredging to Clear/Generate Navigational Channel — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at Bankot… — coastal clearance granted
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed
15 Maharashtra Maritime Board projects in Raigarh
All 101 Maharashtra Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.