Quick answers
What is this project?
Error correction in Coastal Zone Management Plan (CZMP) 2019 (Sheet no. E 43 B 4/ SW, Map no. MH 77) for Development of Infrastructure requirements of PMAY and other housing schemes at Taloja Node, STP, MBR, Fire station, Road and for further development pocket at sector-37, Taloja, Navi Mumbai, District-Raigad, State-Maharashtra is a lapsed building project in Pendhar, Panvel, Raigarh, Maharashtra. The site covers 29 acres.
Who is building it?
The applicant is City and Industrial Development Corporation of Maharashtra Limited.
Has it been approved?
No. The application was lapsed on 12 Nov 2025, so it is no longer under consideration.
Where is it?
In Pendhar, Panvel, Raigarh, Maharashtra.
How big is it?
It has a site of 29 acres.
When was it filed?
The application was filed on 9 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Nov 2025 |
| Application filed | 9 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | City and Industrial Development Corporation of Maharashtra Limited |
| Land area | 29 acres (11.7 ha) |
| Village / locality | Pendhar |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17776 |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 29 acres, this one is larger than 84% of them.
232 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pendhar, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing, Laying & Commissioning of Water Supply Line and Raw Sewage Rising… — coastal clearance granted, 150 m away
- Pradhan Mantri Awas Yojana (PMAY) Housing Scheme at Plot No. 14, Sector 37,… — environmental approval granted, 450 m away
- Proposed Residential and Commercial Building Project by M/s. Lively Lifespaces… — environmental approval granted, 600 m away
- Geetanjali Belleza — environmental approval granted, 600 m away
- Environmental Clearance for Proposed Development "Geetanjali Belleza" at Plot… — withdrawn, 600 m away
- Proposed Residential Cum Commercial Building on Plot No. 01, Sector 24,… — environmental approval granted, 650 m away
- CRZ Clearance for Proposed residential cum commercial building known as… — recommended by coastal authority, 650 m away
- Proposed Residential cum Commercial Project on land bearing survey No. 114 &… — environmental approval granted, 1.2 km away
More from City and Industrial Development Corporation of Maharashtra Limited in Raigarh
- Diversion of Forest land for proposed construction of Kondhane Dam in Karjat… — more information requested
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — lapsed
- Integrated Infrastructure Works of Roads (Stage-I), S.W. Drain, Footpath,… — returned to applicant
- Integrated Infrastructure Facilities Like Roads (1st Stage), S.W. Drainage… — recommended by coastal authority
- Roads and Channels on Forest land for Town Planning Scheme (TPS 2 to TPS 12)… — lapsed
- Development of land for International Education City — lapsed
27 City and Industrial Development Corporation of Maharashtra projects in Raigarh
All 34 City and Industrial Development Corporation of Maharashtra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.