Quick answers
What is 54.00m Bridge Over River Khynriem between Saibual & Moulasei?
54.00m Bridge Over River Khynriem between Saibual & Moulasei is a lapsed road project in Artan, Saipung, East Jaintia Hills, Meghalaya. The site covers 0.1 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
No. The application was lapsed on 20 Apr 2026, so it is no longer under consideration.
Where is it?
In Artan, Saipung, East Jaintia Hills, Meghalaya.
How big is it?
It has a stated cost of ₹4.8 crore; a site of 0.1 acres and 200 m² of forest land.
When was it filed?
The application was filed on 21 Nov 2022.
Project details
| Official title | Construction of 54.00m Bridge Over River Khynriem between Saibual & Moulasei . |
|---|---|
| Status | Lapsed |
| Status since | 20 Apr 2026 |
| Application filed | 21 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rural Development |
| Land area | 400 m² |
| Forest land | 200 m² |
| Project cost | ₹4.8 crore |
| Village / locality | Artan |
| Taluk / tehsil | Saipung |
| District | East Jaintia Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00357 |
In context
5 applications in East Jaintia Hills since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Artan, Saipung, East Jaintia Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 54.00m Bailey Bridge Over River Khynriem Between Saibual and Moulasei — in-principle approval, conditions pending, 0 m away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — environmental approval granted, 17.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — environmental approval granted, 17.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — withdrawn, 17.8 km away
- Integrated Cement Plant with capacity of clinker: 0.95 million TPA, Cement:… — cleared for impact study, 17.8 km away
- Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production… — under environmental review, 19.1 km away
- Lum Syrman Limestone Block- A (ML Area: 217.394 ha.) with Limestone Production… — under environmental review, 19.1 km away
- Limestone Mine — environmental approval granted, 19.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.