Quick answers
What is Nimbhora Murrum Quarry?
Nimbhora Murrum Quarry is an approved mining project in Nimbhora, Bhainsdehi, Betul, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Akhilesh Shekhawat.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Nimbhora, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Akhilesh Shekhawat |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Nimbhora |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00117 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nimbhora, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thapoda Stone Quarry — environmental approval granted, 700 m away
- Thapoda Stone Quarry — environmental approval granted, 700 m away
- Bsnl 4g Saturation Project — lapsed, 1 km away
- Bsnl 4g Saturation Project — lapsed, 1.4 km away
- 11 KV Janona Mix feeder, FSP works under RDSS KfW (FSP) package — under forest review, 8.6 km away
- Bsnl 4g Saturation Project — lapsed, 9.6 km away
- 4g Saturation Project — lapsed, 9.8 km away
- Bsnl 4g Tower at Banoor in Mission 500 Days for Uncovered Villages — lapsed, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.