Quick answers
What is Thapoda Stone Quarry?
Thapoda Stone Quarry is an approved mining project in Thapora, Bhainsdehi, Betul, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Manglesh Jaiswal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Nov 2026), as of 27 Nov 2026.
Where is it?
In Thapora, Bhainsdehi, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 23 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Nov 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Manglesh Jaiswal |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Thapora |
| Taluk / tehsil | Bhainsdehi |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-07735 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 23 Apr 2026 (this page) | Environmental approval granted | 4.9 acres | ₹30 lakh |
| New project filed 31 Oct 2023 | Environmental approval granted | 4.9 acres | ₹30 lakh |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Thapora, Bhainsdehi, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thapoda Stone Quarry — environmental approval granted, 0 m away
- Bsnl 4g Saturation Project — lapsed, 450 m away
- Nimbhora Murrum Quarry — environmental approval granted, 700 m away
- Bsnl 4g Saturation Project — lapsed, 750 m away
- 11 KV Janona Mix feeder, FSP works under RDSS KfW (FSP) package — under forest review, 8 km away
- Bsnl 4g Saturation Project — lapsed, 8.9 km away
- 4g Saturation Project — lapsed, 9.2 km away
- Bsnl 4g Tower at Banoor in Mission 500 Days for Uncovered Villages — lapsed, 9.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.