What is Developing? Open the mapMap

Environmental approval grantedPower · Betul, Madhya Pradesh

1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V, Unit no. 12) at Sarni, Tehsil Ghoradongri, Village Brahmanwada Ryt, District Betul, Madhya Pradesh

1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V, Unit no. 12) at Sarni, Tehsil Ghoradongri, Village Brahmanwada Ryt, District Betul, Madhya Pradesh is an approved power project in Brahmanwada Ryt (Viran), Ghoda Dongri, Betul, Madhya Pradesh. The site covers 1,295.8 acres. Its stated project cost is ₹9,018.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Nov 2023).

See it on the live map All projects in Betul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V, Unit no. 12) at Sarni, Tehsil Ghoradongri, Village Brahmanwada Ryt, District Betul, Madhya Pradesh is an approved power project in Brahmanwada Ryt (Viran), Ghoda Dongri, Betul, Madhya Pradesh. The site covers 1,295.8 acres.

Who is building it?

The applicant is Madhya Pradesh Power Generating Co. Limited (Mppgcl).

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Nov 2023), as of 27 Nov 2026.

Where is it?

In Brahmanwada Ryt (Viran), Ghoda Dongri, Betul, Madhya Pradesh.

How big is it?

It has a stated cost of ₹9,018.5 crore and a site of 1,295.8 acres.

When was it filed?

The application was filed on 21 Nov 2023.

Project details

StatusEnvironmental approval granted
Status since21 Nov 2023
Application filed21 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorPower
ApplicantMadhya Pradesh Power Generating Co. Limited (Mppgcl)
Land area1,295.8 acres (524.4 ha)
Project cost₹9,018.5 crore
Village / localityBrahmanwada Ryt (Viran)
Taluk / tehsilGhoda Dongri
DistrictBetul
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-00170

In context

39 applications in Betul since January 2022 are in the same category (Power): 7 approved, 26 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1,295.8 acres, this one is larger than 95% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Brahmanwada Ryt (Viran), Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.