2x250 MW Thermal Power Plant at Satpura Thermal Power Station (STPS), Sarni – Extension Units 10 & 11 is an approved power project in Sarni, Ghoda Dongri, Betul, Madhya Pradesh. The site covers 464.2 acres.
Who is building it?
The applicant is Madhya Pradesh Power Generating Company Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Sept 2023), as of 27 Nov 2026.
Where is it?
In Sarni, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3,514 crore and a site of 464.2 acres.
When was it filed?
The application was filed on 27 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Sept 2023 |
| Application filed | 27 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Madhya Pradesh Power Generating Company Limited |
| Land area | 464.2 acres (187.9 ha) |
| Project cost | ₹3,514 crore |
| Village / locality | Sarni |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01218 |
In context
39 applications in Betul since January 2022 are in the same category (Power): 7 approved, 26 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 464.2 acres, this one is larger than 90% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarni, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — under environmental review, 250 m away
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — environmental approval granted, 250 m away
- 1x660 MW Satpura Super-critical Thermal Power Project (Expansion, Phase-V,… — environmental approval granted, 500 m away
- P2P Networks Private Limited - Laying of OFC cable between Sarni 220 KV Sub… — forest land use approved, 550 m away
- Expansion of 2x250 MW (Phase IV) & 1x660 MW (Phase V) -Proposed 2nd unit of… — returned to applicant, 700 m away
- Development of Samudayik Kendra at Mokshdham — lapsed, 950 m away
- Proposed Cement Grinding Unit of 4.0 MTPA of M/s Orient Cement Limited Taluka:… — cleared for impact study, 1.3 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 1.3 km away
More from Madhya Pradesh Power Generating Company Limited in Betul
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — under environmental review
- Expansion of 2x250 MW (Phase IV) & 1x660 MW (Phase V) -Proposed 2nd unit of… — returned to applicant
- Amendment of lx660 MW Satpura Ultra Super-critical Thermal Power Project -… — environmental approval granted
- Diversion of 8.6 Hectare Forest Land at Westward Downstream of Old Ash Pond… — more information requested
- Diversion of 373 Hectare (Old Ash pond) Ash pond land for installation of 200… — more information requested
6 Madhya Pradesh Power projects in Betul
All 9 Madhya Pradesh Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.