Quick answers
What is Industrial project by M/s TACC Limited?
This approved industrial project by M/s TACC Limited is in Sarsoda, Sonkatch, Dewas, Madhya Pradesh. The site covers 315.2 acres.
Who is building it?
The applicant is Tacc Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Oct 2023), as of 27 Nov 2026.
Where is it?
In Sarsoda, Sonkatch, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,800 crore and a site of 315.2 acres.
When was it filed?
The application was filed on 26 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Oct 2023 |
| Application filed | 26 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Tacc Limited |
| Land area | 315.2 acres (127.6 ha) |
| Project cost | ₹1,800 crore |
| Village / locality | Sarsoda |
| Taluk / tehsil | Sonkatch |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01176 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Oct 2023 (this page) | Environmental approval granted | 315.2 acres | ₹1,800 crore |
| Early planning filed 2 Sept 2023 | Cleared for impact study | 315.2 acres | ₹1,800 crore |
In context
11 applications in Dewas since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarsoda, Sonkatch, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s TACC Limited — cleared for impact study, 0 m away
- Sarsoda Stone Quarry — lapsed, 1.1 km away
- Phavda Stone Quarry — cleared for impact study, 1.5 km away
- Phavda Stone Quarry — lapsed, 1.5 km away
- Phavda Stone Quarry — lapsed, 1.5 km away
- Oad StoneQuarry — environmental approval granted, 3.8 km away
- Oad StoneQuarry — lapsed, 3.8 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.