Quick answers
What is Sarsoda Stone Quarry?
Sarsoda Stone Quarry is a lapsed mining project in Saroda, Sonkatch, Dewas, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Mahipal Baghel.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Saroda, Sonkatch, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 6 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 6 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mahipal Baghel |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Saroda |
| Taluk / tehsil | Sonkatch |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04531 |
In context
215 applications in Dewas since January 2022 are in the same category (Mining): 103 approved, 47 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Saroda, Sonkatch, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Phavda Stone Quarry — cleared for impact study, 350 m away
- Phavda Stone Quarry — lapsed, 350 m away
- Phavda Stone Quarry — lapsed, 350 m away
- Industrial project by M/s TACC Limited — environmental approval granted, 1.1 km away
- Industrial project by M/s TACC Limited — cleared for impact study, 1.1 km away
- Oad StoneQuarry — environmental approval granted, 2.8 km away
- Oad StoneQuarry — lapsed, 2.8 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.