Quick answers
What is Phavda Stone Quarry?
Phavda Stone Quarry is a proposed mining project in Phavda, Sonkatch, Dewas, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Jeevan Yadav.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 May 2025), as of 27 Nov 2026.
Where is it?
In Phavda, Sonkatch, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 1 May 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 May 2025 |
| Application filed | 1 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jeevan Yadav |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Phavda |
| Taluk / tehsil | Sonkatch |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06652 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 1 May 2025 (this page) | Cleared for impact study | 9.9 acres | ₹50 lakh |
| New project filed 20 Apr 2024 | Lapsed | 9.9 acres | ₹50 lakh |
| Early planning filed 12 Jan 2024 | Lapsed | 9.9 acres | ₹50 lakh |
In context
215 applications in Dewas since January 2022 are in the same category (Mining): 103 approved, 47 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 9.9 acres, this one is larger than 55% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Phavda, Sonkatch, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Phavda Stone Quarry — lapsed, 0 m away
- Phavda Stone Quarry — lapsed, 0 m away
- Sarsoda Stone Quarry — lapsed, 350 m away
- Industrial project by M/s TACC Limited — environmental approval granted, 1.5 km away
- Industrial project by M/s TACC Limited — cleared for impact study, 1.5 km away
- Oad StoneQuarry — environmental approval granted, 2.5 km away
- Oad StoneQuarry — lapsed, 2.5 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.