Quick answers
What is Baljhiri Stone Quarry?
Baljhiri Stone Quarry is an approved mining project in Baljhiri, Pansemal, Barwani, Madhya Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Arvind Shukla.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Nov 2023), as of 27 Nov 2026.
Where is it?
In Baljhiri, Pansemal, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and a site of 2.3 acres.
When was it filed?
The application was filed on 8 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Nov 2023 |
| Application filed | 8 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arvind Shukla |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Baljhiri |
| Taluk / tehsil | Pansemal |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01442 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 20 Nov 2026 | Initial checks | 2.3 acres | ₹18 lakh |
| New project filed 8 Nov 2023 (this page) | Environmental approval granted | 2.3 acres | ₹18 lakh |
In context
92 applications in Barwani since January 2022 are in the same category (Mining): 56 approved, 17 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.3 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Baljhiri, Pansemal, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Baljhiri Stone Quarry — initial checks, 0 m away
- Certificate of No increase in pollution load proposed change in raw mix in the… — initial checks, 3.1 km away
- M/s Shree Durga Khandsari Sugar Mills (SDKSM) Proposal for capacity expansion… — environmental approval granted, 3.1 km away
- Expansion of Distillery from 100 KLPD to 300 KLPD — under environmental review, 3.3 km away
- Mining of Jahur Sand Deposit — environmental approval granted, 5.4 km away
- Dondwada Stone Quarry — environmental approval granted, 6.9 km away
- Dondwada Stone Quarry — under environmental review, 7.3 km away
- Moyada Stone Quarry — lapsed, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.