What is Expansion of Distillery from 100 KLPD to 300 KLPD?
Expansion of Distillery from 100 KLPD to 300 KLPD is a proposed industrial project in Mendrana, Pansemal, Barwani, Madhya Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Shree Durga Khandsari Sugar Mills.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mendrana, Pansemal, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹141 crore and a site of 49.4 acres.
When was it filed?
The application was filed on 7 Sept 2026.
Project details
| Official title | Expansion of Distillery from 100 KLPD to 300 KLPD along with Co-generation Power Plant from 1.2 MW to 6.2 MW within existing 4000 TCD Sugar mill & 11 MW Co-generation Power Plant and adjacent land at Village Mendrana, Tehsil Pansemal, District Barwani, Madhya Pradesh by M/s. Shree Durga Khandsari (Sugar) Mills |
|---|---|
| Status | Under environmental review |
| Status since | 18 Sept 2026 |
| Application filed | 7 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shree Durga Khandsari Sugar Mills |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹141 crore |
| Village / locality | Mendrana |
| Taluk / tehsil | Pansemal |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08147 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mendrana, Pansemal, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Certificate of No increase in pollution load proposed change in raw mix in the… — initial checks, 100 m away
- M/s Shree Durga Khandsari Sugar Mills (SDKSM) Proposal for capacity expansion… — environmental approval granted, 100 m away
- Mining of Jahur Sand Deposit — environmental approval granted, 2.5 km away
- Baljhiri Stone Quarry — initial checks, 3.3 km away
- Baljhiri Stone Quarry — environmental approval granted, 3.3 km away
- Dondwada Stone Quarry — environmental approval granted, 9.9 km away
- Dondwada Stone Quarry — under environmental review, 10.5 km away
- Moyada Stone Quarry — lapsed, 12 km away
More from Shree Durga Khandsari Sugar Mills in Barwani
- Certificate of No increase in pollution load proposed change in raw mix in the… — initial checks
- M/s Shree Durga Khandsari Sugar Mills (SDKSM) Proposal for capacity expansion… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.