Quick answers
What is Dondwada Stone Quarry?
Dondwada Stone Quarry is an approved mining project in Donwada, Pansemal, Barwani, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Narendra Koli.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Mar 2025), as of 27 Nov 2026.
Where is it?
In Donwada, Pansemal, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 19 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Mar 2025 |
| Application filed | 19 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Narendra Koli |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Donwada |
| Taluk / tehsil | Pansemal |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04136 |
In context
92 applications in Barwani since January 2022 are in the same category (Mining): 56 approved, 17 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Donwada, Pansemal, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dondwada Stone Quarry — under environmental review, 1.2 km away
- Moyada Stone Quarry — lapsed, 3.3 km away
- Baljhiri Stone Quarry — initial checks, 6.9 km away
- Baljhiri Stone Quarry — environmental approval granted, 6.9 km away
- Kalamba Tank — under forest review, 7 km away
- Certificate of No increase in pollution load proposed change in raw mix in the… — initial checks, 9.8 km away
- M/s Shree Durga Khandsari Sugar Mills (SDKSM) Proposal for capacity expansion… — environmental approval granted, 9.8 km away
- Expansion of Distillery from 100 KLPD to 300 KLPD — under environmental review, 9.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.