Quick answers
What is Kothadi Istmurar Stone (Gitti) Quarry?
Kothadi Istmurar Stone (Gitti) Quarry is an approved mining project in Kothadi Istmurar, Jiran, Neemuch, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Vikram Patidar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jun 2024), as of 27 Nov 2026.
Where is it?
In Kothadi Istmurar, Jiran, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 5 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Jun 2024 |
| Application filed | 5 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vikram Patidar |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Kothadi Istmurar |
| Taluk / tehsil | Jiran |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01613 |
In context
122 applications in Neemuch since January 2022 are in the same category (Mining): 63 approved, 23 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Kothadi Istmurar, Jiran, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhimakhedi Stone (Gitti) Quarry — environmental approval granted, 3.3 km away
- Arnyamangir Stone Quarry Project — environmental approval granted, 4.6 km away
- Chothkheda Stone Quarry — lapsed, 6.5 km away
- Neemuch Cheetakheda Jeeran Malhargarh 2 Lane Road — lapsed, 6.9 km away
- Proposed 120 KLD Grain Based Ethanol plantalong with 3.4MW Co-generation Power… — environmental approval granted, 7 km away
- Pipliya Baag Murrum Quarry for S.T.P — environmental approval granted, 7.4 km away
- Expansion of Grain based Distillery Plant from 325 KLPD to 850 KLPD and… — environmental approval granted, 7.9 km away
- Expansion of Grain based Distillery Plant from 325 KLPD to 850 KLPD and… — cleared for impact study, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.