Cleared for impact studyMining · Satna, Madhya Pradesh

Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity from 0.5 Million TPA To 2.30 Million TPA

Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity from 0.5 Million TPA To 2.30 Million TPA is a proposed mining project in Tilaura, Maihar, Satna, Madhya Pradesh. The site covers 477.5 acres. Its stated project cost is ₹145 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 May 2023).

See it on the live map All projects in Satna

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity…

Project details

Official titleTiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity from 0.5 Million TPA To 2.30 Million TPA along with Top Soil 0.05 Million TPA, Over Burden 0.45 Million TPA (Total Excavation 2.8 Million TPA) With along with installation of Crusher with capacity of 1100 TPH with installation of conveyor belt of length 8.6 km at Village: Tiloura, Jurwa, Silouti, Sirmilli, Tehsil: Maihar District: Satna, Madhya Pradesh of M/s. UltraTech Cement Limited (Maihar Cement Works)
StatusCleared for impact study
Status since1 May 2023
Application filed1 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUltraTech Cement Limited
Land area477.5 acres (193.3 ha)
Project cost₹145 crore
Village / localityTilaura
Taluk / tehsilMaihar
DistrictSatna
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-02153

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 16 Nov 2023Environmental approval granted477.5 acres₹145 crore
Early planning filed 1 May 2023 (this page)Cleared for impact study477.5 acres₹145 crore

In context

206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 477.5 acres, this one is larger than 87% of them.

No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.

Where it is

Tilaura, Maihar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from UltraTech Cement Limited in Satna

14 UltraTech Cement projects in Satna
All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.