Project details
| Official title | Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone Production Capacity from 0.5 Million TPA To 2.30 Million TPA along with Top Soil 0.05 Million TPA, Over Burden 0.45 Million TPA (Total Excavation 2.8 Million TPA) With along with installation of Crusher with capacity of 1100 TPH with installation of conveyor belt of length 8.6 km at Village: Tiloura, Jurwa, Silouti, Sirmilli, Tehsil: Maihar District: Satna, Madhya Pradesh of M/s. UltraTech Cement Limited (Maihar Cement Works) |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 477.5 acres (193.3 ha) |
| Project cost | ₹145 crore |
| Village / locality | Tilaura |
| Taluk / tehsil | Maihar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02440 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Nov 2023 (this page) | Environmental approval granted | 477.5 acres | ₹145 crore |
| Early planning filed 1 May 2023 | Cleared for impact study | 477.5 acres | ₹145 crore |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 477.5 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Tilaura, Maihar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tiloura Limestone Mine (ML Area – 193.252 ha) Expansion in Limestone… — cleared for impact study, 0 m away
- Silauti Stone Mine — lapsed, 700 m away
- Silauti Stone (For making Gitti by Mechanical Crushing) & M-Sand Deposit — environmental approval granted, 1000 m away
- Silauti Stone (For making Gitti by Mechanical Crushing) & M-Sand Deposit — cleared for impact study, 1000 m away
- Sirmili Stone Mine — lapsed, 2.6 km away
- Naraura Stone Mine, M/s Rai Stone Crusher — lapsed, 2.6 km away
- Jura Stone Mine — lapsed, 2.9 km away
- Pahadi Limestone Block, 102.861 ha. — environmental approval granted, 3.1 km away
More from UltraTech Cement Limited in Satna
- Bhadanpur Limestone Mine (ML Area: 663 ha) with Limestone Production Capacity:… — withdrawn
- Atarhara Parsokha Limestone Block (Area: 349.172 Ha) with Limestone Production… — under environmental review
- Riwara Limestone Block (ML Area: 302.245 ha) with Limestone Production… — cleared for impact study
- Extension in Validity of Environment Clearance letter No J-11015/46/2010-IA.II… — environmental approval granted
- Expansion in Limestone Production Capacity from 0.50 million TPA to 1.0… — environmental approval granted
- Expansion in Bhadanpur Limestone Mine (ML Area: 663 ha) production capacity of… — under environmental review
14 UltraTech Cement projects in Satna
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.