One of 2 filings for this project. The project's main page, with every filing and where each stands: Bikor Kalan Crusher Stone Quarry
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Jun 2025 |
| Application filed | 3 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashok Kumar |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Bikor Kalan |
| Taluk / tehsil | Malthon |
| District | Sagar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02922 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Apr 2026 | Under environmental review | 7.4 acres | ₹25 lakh |
| Early planning filed 3 Jun 2025 (this page) | Lapsed | 7.4 acres | ₹25 lakh |
In context
256 applications in Sagar since January 2022 are in the same category (Mining): 89 approved, 35 filed or under review, and 132 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.4 acres, this one is larger than 56% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bikor Kalan, Malthon, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bikor Kalan Crusher Stone Quarry — under environmental review, 0 m away
- Sanjeevani Clinic Under CM Sanjeevani Clinic Project by CMO barodiyakalan — forest land use approved, 4.6 km away
- MBR (Sump Well) Under Amrit 2.0 water supply scheme in Barodiyakalan — lapsed, 4.7 km away
- Drinking Water Project under Amrut 2.0 in Barodiyakalan, Malthone District… — more information requested, 4.7 km away
- Water Treatment Plan — lapsed, 4.7 km away
- Water Treatment Plant under Amrut 2.0 by CMO Barodiyakalan — lapsed, 4.8 km away
- Notha Tank Scheme — lapsed, 8.1 km away
- Construction Kachcha Road to Pakka Road (Black Top) From 4 Lane to Notha… — more information requested, 8.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.