Project details
| Status | More information requested |
|---|---|
| Status since | 9 Dec 2025 |
| Application filed | 30 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Nagar Parishad Barodiyakalan |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Barodiya Kalan |
| Taluk / tehsil | Malthon |
| District | Sagar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10020 |
In context
23 applications in Sagar since January 2022 are in the same category (Water & irrigation): 7 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 2.4 acres, this one is smaller than 91% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barodiya Kalan, Malthon, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Treatment Plan — lapsed, 0 m away
- MBR (Sump Well) Under Amrit 2.0 water supply scheme in Barodiyakalan — lapsed, 50 m away
- Water Treatment Plant under Amrut 2.0 by CMO Barodiyakalan — lapsed, 100 m away
- Sanjeevani Clinic Under CM Sanjeevani Clinic Project by CMO barodiyakalan — forest land use approved, 800 m away
- Notha Tank Scheme — lapsed, 4.1 km away
- Bikor Kalan Crusher Stone Quarry — under environmental review, 4.7 km away
- Bikor Kalan Crusher Stone Quarry — lapsed, 4.7 km away
- Construction Kachcha Road to Pakka Road (Black Top) From 4 Lane to Notha… — more information requested, 5.2 km away
More from Nagar Parishad Barodiyakalan in Sagar
- Water Treatment Plan — lapsed
- MBR (Sump Well) Under Amrit 2.0 water supply scheme in Barodiyakalan — lapsed
- Sanjeevani Clinic Under CM Sanjeevani Clinic Project by CMO barodiyakalan — forest land use approved
- Water Treatment Plant under Amrut 2.0 by CMO Barodiyakalan — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.