Project details
| Official title | Construction of MBR (Sump Well) Under Amrit 2.0 water supply scheme in Barodiyakalan |
|---|---|
| Status | Lapsed |
| Status since | 26 Mar 2024 |
| Application filed | 24 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Nagar Parishad Barodiyakalan |
| Land area | 1,200 m² |
| Forest land | 1,230 m² |
| Project cost | ₹1.2 crore |
| Village / locality | Malthone Rf |
| Taluk / tehsil | Malthon |
| District | Sagar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09751 |
In context
23 applications in Sagar since January 2022 are in the same category (Water & irrigation): 7 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0.3 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malthone Rf, Malthon, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Drinking Water Project under Amrut 2.0 in Barodiyakalan, Malthone District… — more information requested, 50 m away
- Water Treatment Plan — lapsed, 50 m away
- Water Treatment Plant under Amrut 2.0 by CMO Barodiyakalan — lapsed, 100 m away
- Sanjeevani Clinic Under CM Sanjeevani Clinic Project by CMO barodiyakalan — forest land use approved, 800 m away
- Notha Tank Scheme — lapsed, 4.1 km away
- Bikor Kalan Crusher Stone Quarry — under environmental review, 4.7 km away
- Bikor Kalan Crusher Stone Quarry — lapsed, 4.7 km away
- Construction Kachcha Road to Pakka Road (Black Top) From 4 Lane to Notha… — more information requested, 5.2 km away
More from Nagar Parishad Barodiyakalan in Sagar
- Drinking Water Project under Amrut 2.0 in Barodiyakalan, Malthone District… — more information requested
- Water Treatment Plan — lapsed
- Sanjeevani Clinic Under CM Sanjeevani Clinic Project by CMO barodiyakalan — forest land use approved
- Water Treatment Plant under Amrut 2.0 by CMO Barodiyakalan — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.