Quick answers
What is this project?
Proposed Expansion of Bandhaura Thermal Power Plant under Phase–III by adding 1600 (2x800) MW Ultra Super Critical TPP to Existing 2800 (1200+1600) MW Ph-I & Ph-II within the existing plant boundary of Thermal Power Plant is an approved power project in Badhaura, Singrauli, Madhya Pradesh. The site covers 1,170 acres.
Who is building it?
The applicant is Mahan Energen Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Feb 2025), as of 27 Nov 2026.
Where is it?
In Badhaura, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹37,293.5 crore and a site of 1,170 acres.
When was it filed?
The application was filed on 10 Jan 2025.
Project details
| Official title | Proposed Expansion of Bandhaura Thermal Power Plant under Phase–III by adding 1600 (2x800) MW Ultra Super Critical TPP to Existing 2800 (1200+1600) MW Ph-I & Ph-II within the existing plant boundary of Thermal Power Plant at District Singrauli, Madhya Pradesh by Mahan Energen Limited (MEL) |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Feb 2025 |
| Application filed | 10 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Mahan Energen Limited |
| Land area | 1,170 acres (473.5 ha) |
| Project cost | ₹37,293.5 crore |
| Village / locality | Badhaura |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03029 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 10 Jan 2025 (this page) | Environmental approval granted | 1,170 acres | ₹37,293.5 crore |
| Early planning filed 23 Jan 2024 | Cleared for impact study | 1,170 acres | ₹37,293.5 crore |
In context
16 applications in Singrauli since January 2022 are in the same category (Power): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 1,170 acres, this one is larger than 50% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badhaura, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Bandhaura Thermal Power Plant under Phase–III by adding… — cleared for impact study, 0 m away
- 33 KV HT Line from 132 KV S/s Nagwa to Mahan Coal Block of M/s JK Cement Limited — forest land use approved, 1.4 km away
- 2x600 MW Mahan Super Thermal Power Plant — environmental approval granted, 1.5 km away
- Expansion of Bandhaura Thermal Power Plant by Adding 1600 (2x800) MW Capacity… — environmental approval granted, 1.5 km away
- Residential Township for Bandhaura Thermal Power Plant — environmental approval granted, 1.7 km away
- 132 KV Dcss Line From 132 KV S/S Rajmilan to M/S Emil Mines and Mineral… — forest land use approved, 1.9 km away
- 132 KV Dcss Line From 132 KV S/S Rajmilan to M/S Emil Mines and Mineral… — lapsed, 1.9 km away
- Bandhaura to Amiliya (Construction of the road from Bandhaura to Amiliya… — forest land use approved, 2.6 km away
More from Mahan Energen Limited in Singrauli
- Mara II Mahan Coal Mine — under forest review
- Mara II Mahan Coal Mine — lapsed
- Mara II Mahan Coal Mine — forest land use approved
- Gondbahera Ujheni East Coal Mine — environmental approval granted
- Railway Siding from Gajara Bahara Station to Dhirauli Coal Mine by Mahan… — forest land use approved
- Long Belt Conveyer from Dhirauli Coal Mine to Mahan TPP by Mahan Energen Limited — forest land use approved
All 13 Mahan Energen projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.