Project details
| Status | Initial checks |
|---|---|
| Status since | 8 Nov 2024 |
| Application filed | 8 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | UltraTech Cement Limited |
| Use | Industrial |
| Land area | 571.5 acres (231.3 ha) |
| Plot area | 23,12,800 m² (2,48,94,748 sq ft) |
| Project cost | ₹2,686.5 crore |
| Village / locality | Tonki |
| Taluk / tehsil | Manawar |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04399 |
In context
12 applications in Dhar since January 2022 are in the same category (Buildings & townships): 6 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 571.5 acres, this one is larger than 75% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tonki, Manawar, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — environmental approval granted, 400 m away
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — cleared for impact study, 400 m away
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks, 400 m away
- Toki Stone Quarry for Gitti and M-Sand (B1) — cleared for impact study, 1.7 km away
- Toki Stone Quarry for Gitti and M-Sand — lapsed, 1.7 km away
- Toki Stone Gitti & M Sand Quarry (LOI-1412) — lapsed, 2 km away
- Toki Stone Gitti & M Sand Quarry (LOI-1414) — lapsed, 2.1 km away
- Badgaon Stone (Gitti) Quarry — lapsed, 4.4 km away
More from UltraTech Cement Limited in Dhar
- Dedli B Limestone Block (ML Area: 445.748 ha) with Limestone Production… — cleared for impact study
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — environmental approval granted
- Transfer / Name Change in the Environment Clearance granted for "Limestone… — under environmental review
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — cleared for impact study
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks
6 UltraTech Cement projects in Dhar
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.