Project details
| Official title | Transfer / Name Change in the Environment Clearance granted for "Limestone Mine (Opencast Semi Mechanized Method) in an area of 4.502 Ha for production capacity of 8000 cum/year at Khasra No. 1/1/3, 5/1/1/1/1/1/6, 5/1/1/1/1/1/1/1/2k, 5/1/1/1/1/1/1/1/2 kha, at Village- Sitapuri, Tehsil- Manawar, Dist- Dhar (M.P.) from Shri Harish Khandelwal to M/s. UltraTech Cement Limited. |
|---|---|
| Status | Under environmental review |
| Status since | 14 Nov 2026 |
| Application filed | 18 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | UltraTech Cement Limited |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹9 crore |
| Village / locality | Sitapuri |
| Taluk / tehsil | Manawar |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06952 |
In context
364 applications in Dhar since January 2022 are in the same category (Mining): 203 approved, 35 filed or under review, and 126 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 11.1 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Sitapuri, Manawar, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Badiya Limestone Mine 4.999 Ha — lapsed, 1.9 km away
- Badiya Limestone Block (Area- 3.625 ha.) — environmental approval granted, 2.1 km away
- Badiya Limestone Block (Area- 3.625 ha.) — cleared for impact study, 2.1 km away
- 4.028 ha Badiya Limestone Mine — environmental approval granted, 2.2 km away
- Badiya Limestone Mine Area 4.028 Ha — lapsed, 2.2 km away
- (Narmada River Part_B) Upper Narmada — forest land use approved, 3.1 km away
- Badiya Limestone Mine 4.50 ha — lapsed, 3.3 km away
- Expansion of Cement Plant Capacity ; Clinker 0.825 MTPA to 1.10 MTPA, Cement:… — environmental approval granted, 5.1 km away
More from UltraTech Cement Limited in Dhar
- Dedli B Limestone Block (ML Area: 445.748 ha) with Limestone Production… — cleared for impact study
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — environmental approval granted
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — cleared for impact study
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks
6 UltraTech Cement projects in Dhar
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.