One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million TPA of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Sept 2025 |
| Application filed | 9 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | UltraTech Cement Limited |
| Land area | 571.5 acres (231.3 ha) |
| Project cost | ₹3,057 crore |
| Village / locality | Golpura |
| Taluk / tehsil | Manawar |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05539 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 22 Jul 2026 | Environmental approval granted | 571.5 acres | ₹3,057 crore |
| Early planning filed 9 Sept 2025 (this page) | Cleared for impact study | 571.5 acres | ₹3,057 crore |
In context
53 applications in Dhar since January 2022 are in the same category (Industry): 30 approved, 14 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 571.5 acres, this one is larger than 83% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Golpura, Manawar, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Cement Production capacity from 6.0 Million TPA to 8.5 Million… — environmental approval granted, 0 m away
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks, 0 m away
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks, 400 m away
- Toki Stone Quarry for Gitti and M-Sand (B1) — cleared for impact study, 1.3 km away
- Toki Stone Quarry for Gitti and M-Sand — lapsed, 1.3 km away
- Toki Stone Gitti & M Sand Quarry (LOI-1412) — lapsed, 1.6 km away
- Toki Stone Gitti & M Sand Quarry (LOI-1414) — lapsed, 1.7 km away
- Badgaon Stone (Gitti) Quarry — lapsed, 4.2 km away
More from UltraTech Cement Limited in Dhar
- Dedli B Limestone Block (ML Area: 445.748 ha) with Limestone Production… — cleared for impact study
- Transfer / Name Change in the Environment Clearance granted for "Limestone… — under environmental review
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks
- Expansion in cement production capacity of existing integrated Cement Plant… — initial checks
6 UltraTech Cement projects in Dhar
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.