Quick answers
What is Jankhai Pumped Storage Project?
Jankhai Pumped Storage Project is a proposed water and irrigation project in Pangarhi Khurd, Sirmour, Rewa, Madhya Pradesh. The site covers 1,947.9 acres.
Who is building it?
The applicant is Gsc Psp Madhya Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Sept 2025), as of 27 Nov 2026.
Where is it?
In Pangarhi Khurd, Sirmour, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹6,313.6 crore and a site of 1,947.9 acres.
When was it filed?
The application was filed on 20 Aug 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Sept 2025 |
| Application filed | 20 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Gsc Psp Madhya Private Limited |
| Land area | 1,947.9 acres (788.3 ha) |
| Project cost | ₹6,313.6 crore |
| Village / locality | Pangarhi Khurd |
| Taluk / tehsil | Sirmour |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05779 |
In context
12 applications in Rewa since January 2022 are in the same category (Water & irrigation): 6 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,947.9 acres, this one is smaller than 67% of them.
Where it is
Pangarhi Khurd, Sirmour, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tamas Mvs — forest land use approved, 10.2 km away
- Amended Bharat Net Project BSNL/Linear UG OFC Laying project in Jawa block DFO… — forest land use approved, 12.3 km away
- Development of Kyoti fort, Dist Rewa — lapsed, 12.9 km away
- Chhadahna Stone(Gitti & M-Sand) Quarry — environmental approval granted, 17.3 km away
- Upgradation of the Sirmaur - Dabhaura Section of Nh-135b, From Ch. 36.700… — more information requested, 18.7 km away
- M/S Kharauli Small Hydro Power Project — under forest review, 22.3 km away
- No Increase in Pollution Load due to proposed change in product mix with… — initial checks, 23.1 km away
- Greenfield Project of 120 KLPD Grain Based Ethanol Plant — environmental approval granted, 23.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.