One of 3 filings for this project. The project's main page, with every filing and where each stands: "PROPOSED NANO UREA MANUFACTURING UNIT" at Plot no.6 GAE, Plot no.11 GAE, Plot no.9 GAE,…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 19 Aug 2025 |
| Application filed | 26 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Nano Fertilizers Private Limited |
| Land area | 11.8 acres (4.8 ha) |
| Project cost | ₹178.1 crore |
| Village / locality | Ghirongi |
| Taluk / tehsil | Gohad |
| District | Bhind |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-06225 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Jul 2025 (this page) | Returned to applicant | 11.8 acres | ₹178.1 crore |
| New project filed 25 Jul 2023 | Environmental approval granted | 11.8 acres | ₹178.1 crore |
| Early planning filed 14 Jun 2023 | Cleared for impact study | 11.8 acres | ₹178.1 crore |
In context
15 applications in Bhind since January 2022 are in the same category (Industry): 10 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.8 acres, this one is smaller than 53% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghirongi, Gohad, Bhind, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Product Mix Change in Existing Nano-Urea Manufacturing Unit without… — initial checks, 0 m away
- "PROPOSED NANO UREA MANUFACTURING UNIT" at Plot no.6 GAE, Plot no.11 GAE, Plot… — environmental approval granted, 0 m away
- "PROPOSED NANO UREA MANUFACTURING UNIT" at Plot no.6 GAE, Plot no.11 GAE, Plot… — cleared for impact study, 0 m away
- PROPOSED SYNTHETIC ORGANIC CHEMICAL PRODUCTION (AZODICARBONAMIDE -ADC,… — environmental approval granted, 550 m away
- PROPOSED SYNTHETIC ORGANIC CHEMICAL PRODUCTION (AZODICARBONAMIDE -ADC,… — cleared for impact study, 550 m away
- Building project by AGI Greenpac Limited — environmental approval granted, 1.1 km away
- Proposed Factory Shed - Built up Area - 120315.23 sqm belong to M/s Gautam… — environmental approval granted, 1.4 km away
- Industrial project by M/s. Octet Pharmachem Pvt. Ltd. — under environmental review, 1.9 km away
More from Nano Fertilizers Private Limited in Bhind
All 4 Nano Fertilizers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.