What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Bhind, Madhya Pradesh

Proposed Factory Shed - Built up Area - 120315.23 sqm belong to M/s Gautam Solar Power Pvt. Ltd. for establishment of Solar Cell, of capacity 5 GW.

Proposed Factory Shed - Built up Area - 120315.23 sqm belong to M/s Gautam Solar Power Pvt. Ltd. for establishment of Solar Cell, of capacity 5 GW is an approved industrial building project in Ghirongi, Gohad, Bhind, Madhya Pradesh. The site covers 57.7 acres. Its stated project cost is ₹1,200 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Nov 2026).

See it on the live map All projects in Bhind

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since10 Nov 2026
Application filed5 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantGautam Solar Power Private Limited
UseIndustrial
Land area57.7 acres (23.4 ha)
Built-up area1,20,315 m² (12,95,059 sq ft)
Plot area2,33,491 m² (25,13,274 sq ft)
Project cost₹1,200 crore
Village / localityGhirongi
Taluk / tehsilGohad
DistrictBhind
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08636

In context

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghirongi, Gohad, Bhind, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.