One of 2 filings for this project. The project's main page, with every filing and where each stands: Waghoda Manganese Ore Mining Project
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Nov 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Anoj Kumar Agarwala |
| Land area | 10.5 acres (4.2 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Waghora |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06537 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Dec 2025 (this page) | Under environmental review | 10.5 acres | ₹95 lakh |
| Early planning filed 17 Feb 2025 | Cleared for impact study | 10.5 acres | ₹95 lakh |
In context
144 applications in Chhindwara since January 2022 are in the same category (Mining): 77 approved, 18 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.5 acres, this one is larger than 71% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Waghora, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Waghoda Manganese Ore Mining Project — cleared for impact study, 0 m away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 500 KLPD to… — initial checks, 4.6 km away
- Ramghat Dam (Chhindwara Irrigation Complex Scheme) — cleared for impact study, 5.1 km away
- Industrial project by Premier Synthochem Industries Pvt. Ltd. — cleared for impact study, 5.3 km away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — initial checks, 5.7 km away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — environmental approval granted, 5.7 km away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 120 KLPD to… — initial checks, 5.8 km away
- Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD by M/s.… — under environmental review, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.