Project details
| Official title | No Increase Pollution Load (NIPL) 50% increase from EC Capacity 500 KLPD to 750 KLPD, EC Capacity 500 KLPD Grain Based Ethanol Plant along with 14.9 MW Cogeneration Power Plant at Plot No. 26, 9 (Part), 8, 7, 6, 5 & 4, M.P.A.K.V.N. Industrial Area, Borgaon, Tehsil Sausar, District Chhindwara, Madhya Pradesh by M/s Gulshan Polyols Limited |
|---|---|
| Status | Initial checks |
| Status since | 20 May 2026 |
| Application filed | 20 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Gulshan Polyols Limited |
| Land area | 20.6 acres (8.3 ha) |
| Project cost | ₹320 crore |
| Village / locality | Borgaon |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07867 |
In context
15 applications in Chhindwara since January 2022 are in the same category (Power): 7 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 20.6 acres, this one is smaller than 53% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borgaon, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Premier Synthochem Industries Pvt. Ltd. — cleared for impact study, 800 m away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — initial checks, 1.3 km away
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — environmental approval granted, 1.3 km away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 120 KLPD to… — initial checks, 1.3 km away
- Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD by M/s.… — under environmental review, 1.3 km away
- Waghoda Manganese Ore Mining Project — under environmental review, 4.6 km away
- Waghoda Manganese Ore Mining Project — cleared for impact study, 4.6 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.