One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited
Project details
| Official title | Proposed 120 KLPD Grain based Ethanol Plant along with 2.5 MW Cogeneration Power Plant at Plot no. 60, Industrial Growth Centre Borgaon, Tehsil Sauser, District Chhindwara, Madhya Pradesh by M/s. UKR Industries Limited |
|---|---|
| Status | Initial checks |
| Status since | 27 Oct 2025 |
| Application filed | 27 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Power |
| Applicant | Ukr Industries Limited |
| Land area | 11.5 acres (4.6 ha) |
| Project cost | ₹135 crore |
| Village / locality | Borgaon |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06011 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Oct 2025 (this page) | Initial checks | 11.5 acres | ₹135 crore |
| New project filed 7 Apr 2023 | Environmental approval granted | 11.5 acres | ₹135 crore |
In context
15 applications in Chhindwara since January 2022 are in the same category (Power): 7 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 11.5 acres, this one is smaller than 73% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Borgaon, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 120 KLPD Grain based Ethanol Plant by M/s. UKR Industries Limited — environmental approval granted, 0 m away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 120 KLPD to… — initial checks, 0 m away
- Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD by M/s.… — under environmental review, 50 m away
- Industrial project by Premier Synthochem Industries Pvt. Ltd. — cleared for impact study, 850 m away
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 500 KLPD to… — initial checks, 1.3 km away
- Environmental Clearance for Proposed Construction of Building Admeasuring… — lapsed, 4.8 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved, 4.9 km away
- Waghoda Manganese Ore Mining Project — under environmental review, 5.7 km away
More from Ukr Industries Limited in Chhindwara
- Expansion of Grain based Distillery Plant from 180 KLPD to 300 KLPD by M/s.… — under environmental review
- No Increase Pollution Load (NIPL) 50% increase from EC Capacity 120 KLPD to… — initial checks
All 4 Ukr Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.