Quick answers
What is this project?
Application for transferring the Environmental Clearance (EC) of 1x500 MW Sanjay Gandhi Thermal Power Station Birsinghpur MP from Madhya Pradesh Electricity Board (MPEB) to Madhya Pradesh Power Generating Company Limited (MPPGCL) is a lapsed power project in Mangthar, Pali, Umaria, Madhya Pradesh. The site covers 246.5 acres.
Who is building it?
The applicant is Sanjay Gandhi Thermal Power Station Extension Stage II.
Has it been approved?
No. The application was lapsed on 22 Jun 2025, so it is no longer under consideration.
Where is it?
In Mangthar, Pali, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1,956.9 crore and a site of 246.5 acres.
When was it filed?
The application was filed on 28 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Jun 2025 |
| Application filed | 28 May 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Sanjay Gandhi Thermal Power Station Extension Stage II |
| Land area | 246.5 acres (99.8 ha) |
| Project cost | ₹1,956.9 crore |
| Village / locality | Mangthar |
| Taluk / tehsil | Pali |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07039 |
In context
17 applications in Umaria since January 2022 are in the same category (Power): 0 approved, 7 filed or under review, and 10 withdrawn, lapsed or rejected. At 246.5 acres, this one is larger than 65% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangthar, Pali, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 75.12 Hect. (Old Ash pond) Ash pond land for installation of 40… — under forest review, 2.2 km away
- Re-Diversion of Forest Land for Construction of Temporary Road for Lifting of… — forest land use approved, 3.1 km away
- Pondi Stone mine for making Boulder — not approved, 5.3 km away
- Water Supply Scheme Under Amrut 2.0 — more information requested, 5.6 km away
- construction of STP LWM Scheme under SBM 2.0 — more information requested, 6.3 km away
- Tummichot Crusher Stone Quarry — lapsed, 7.2 km away
- Tummichhot Stone Quarry — lapsed, 7.2 km away
- Tummichhot Stone Quarry — lapsed, 7.2 km away
More from Sanjay Gandhi Thermal Power Station Extension Stage II in Umaria
- Diversion of 75.12 Hect. (Old Ash pond) Ash pond land for installation of 40… — under forest review
- Re-Diversion of Forest Land for Construction of Temporary Road for Lifting of… — forest land use approved
All 3 Sanjay Gandhi Thermal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.