Quick answers
What is this project?
Re-Diversion of Forest Land for Construction of Temporary Road for Lifting of Ash From Ash Dyke -II at Sgtps, Mppgcl Birsinghpur is an approved road project in Maliagura, Pali, Umaria, Madhya Pradesh. The site covers 2.9 acres.
Who is building it?
The applicant is Sanjay Gandhi Thermal Power Station Extension Stage II.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Nov 2026), as of 27 Nov 2026.
Where is it?
In Maliagura, Pali, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3.8 crore; a site of 2.9 acres and 2.9 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 30 Jul 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 30 Jul 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Sanjay Gandhi Thermal Power Station Extension Stage II |
| Land area | 2.9 acres (1.2 ha) |
| Forest land | 2.9 acres (1.2 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Maliagura |
| Taluk / tehsil | Pali |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09850 |
In context
15 applications in Umaria since January 2022 are in the same category (Roads & highways): 4 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.9 acres, this one is larger than 54% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maliagura, Pali, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 75.12 Hect. (Old Ash pond) Ash pond land for installation of 40… — under forest review, 1 km away
- Water Supply Scheme Under Amrut 2.0 — more information requested, 2.6 km away
- Pondi Stone mine for making Boulder — not approved, 2.8 km away
- Application for transferring the Environmental Clearance (EC) of 1x500 MW… — lapsed, 3.1 km away
- construction of STP LWM Scheme under SBM 2.0 — more information requested, 3.5 km away
- Karkati Sand Mine — environmental approval granted, 5.4 km away
- Water Supply Scheme Under Amrut 2.0 — more information requested, 5.9 km away
- Tummichhot Stone Quarry — lapsed, 8.2 km away
More from Sanjay Gandhi Thermal Power Station Extension Stage II in Umaria
- Application for transferring the Environmental Clearance (EC) of 1x500 MW… — lapsed
- Diversion of 75.12 Hect. (Old Ash pond) Ash pond land for installation of 40… — under forest review
All 3 Sanjay Gandhi Thermal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.