Quick answers
What is this project?
Diversion of 75.12 Hect. (Old Ash pond) Ash pond land for installation of 40 MW Solar Plant at SGTPS, MPPGCL, Birsinghpur, Distt- Umaria (MP)-484552 is a proposed power project in Maliagura, Pali, Umaria, Madhya Pradesh. The site covers 185.6 acres.
Who is building it?
The applicant is Sanjay Gandhi Thermal Power Station Extension Stage II.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Maliagura, Pali, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹183.4 crore; a site of 185.6 acres and 185.6 acres (75.1 ha) of forest land.
When was it filed?
The application was filed on 19 Dec 2024.
Project details
| Status | Under forest review |
|---|---|
| Status since | 24 Dec 2024 |
| Application filed | 19 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Sanjay Gandhi Thermal Power Station Extension Stage II |
| Land area | 185.6 acres (75.1 ha) |
| Forest land | 185.6 acres (75.1 ha) |
| Project cost | ₹183.4 crore |
| Village / locality | Maliagura |
| Taluk / tehsil | Pali |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10276 |
In context
17 applications in Umaria since January 2022 are in the same category (Power): 0 approved, 7 filed or under review, and 10 withdrawn, lapsed or rejected. At 185.6 acres, this one is larger than 59% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maliagura, Pali, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of Forest Land for Construction of Temporary Road for Lifting of… — forest land use approved, 1 km away
- Application for transferring the Environmental Clearance (EC) of 1x500 MW… — lapsed, 2.2 km away
- Pondi Stone mine for making Boulder — not approved, 3.2 km away
- Water Supply Scheme Under Amrut 2.0 — more information requested, 3.5 km away
- construction of STP LWM Scheme under SBM 2.0 — more information requested, 4.2 km away
- Karkati Sand Mine — environmental approval granted, 6.3 km away
- Water Supply Scheme Under Amrut 2.0 — more information requested, 6.6 km away
- Tummichhot Stone Quarry — lapsed, 8.2 km away
More from Sanjay Gandhi Thermal Power Station Extension Stage II in Umaria
- Application for transferring the Environmental Clearance (EC) of 1x500 MW… — lapsed
- Re-Diversion of Forest Land for Construction of Temporary Road for Lifting of… — forest land use approved
All 3 Sanjay Gandhi Thermal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.